Pareena Micasa apartments in Sector 68 Gurgaon

Pareena Micasa
Pareena Micasa

Interested in Pareena Micasa apartments in Sector 68 Gurgaon

 

  •   Best Price
  •   Expert consultation
  •   Free site visit
  •   Over 1000 projects to choose from In Gurgaon

Property Type: Luxury Apartments
Project Area: 13.50 Acres
Size: 2 BHK (865 sqft, 1245 sqft, 1483 sqft, 1705 sqft & 1999 sqft)
Basic Price: 5999/Sq.Ft.
Total Cost: 5000000

 

Amenities

  • Ambulance
  • Badminton Court
  • Cafeteria
  • Gym
  • Health Care
  • Hospital
  • Library
  • Parking
  • School
  • Security Gaurds
  • Shuttle Bus Service
  • Swimming Pool
  • Tennis Court
  • WiFi
  • Yoga & Meditation Area

 

Overview


“A home is where your heart is.” How true this saying is. And how close is the approximation of Micasa Apartments to this perception of home. Come rediscover the truest form of life. Come get amazed by the extra ordinary features of this project that are effortlessly yet simplistically put together to amaze you at every step… every moment. Just to offer you a perfect home that is close to you heart too, Micasa presents homes that articulate class, distinction and luxury differently.

Set on a sprawling 13.48275 acres of an enchanted paradise custom-made to reinvent luxuries for a blissful life, Micasa has premium habitats in the form of 2/3 BHK apartments. With 15 percent lush greens, tranquail surroundings, and serene & pristine lifescapes the 3 side open affordable apartments in gurgaon with a number of never-before luxuries are good enough to transform life into a rhapsody of smiles. Checkout affordable project from Pareena.

 

USP


  • Minutes away from bustling city uproar
  • Double height entrance lobby.
  • Modular kitchen & washrooms.
  • High ceilings and huge balconies.
  • Excellent architecture.
  • Swimming Pool, Jogging Track,
  • Musical Fountains, pool, aqua gym

 

Specification


Living / Dining Room
Flooring Vitrified Tiles
Wall Oil Bound Distemper
Ceiling POP Cornice and oil bound distemper
Door Hardwood frames & Flush doors finished with paints
Windows/Glazing Hardwood/U PVC with required Fitting
Electrical Modular Switches, TV & Telephone Sockets, A.C. Switches.
Master Bedroom
Flooring Laminated Wooden Flooring
Wall Oil Bound Distemper
Ceiling POP Cornice and oil bound distemper
Door Hardwood frames & Flush doors finished with paints
Windows/Glazing Hardwood/U PVC with required Fitting
Electrical Modular Switches, TV & Telephone Sockets, A.C. Switches
Other Bedrooms
Flooring Vitrified Tiles
Wall Oil Bound Distemper
Ceiling POP Cornice and oil bound distemper
Door Hardwood frames & Flush doors finished with paints
Windows/Glazing Hardwood/U PVC with required Fitting
Electrical Modular Switches, TV & Telephone Sockets, A.C. Switches
Kitchen
Flooring Non- skid ceramic Tiles
Wall Ceramic / glazed Tiles up to 2 ft. height above kitchen platform
Ceiling Oil Bound Distemper
Door Hardwood frames & Flush doors finished with paints
Windows/Glazing Hardwood/U PVC with required Fitting
Platform Sink Pre-polished Granite Platform with single bowel Stainless Steel
Fittings/Fixtures CP Fittings
Electrical Modular Switches
Toilets
Flooring Non- skid ceramic Tiles
Wall Ceramic/Glazed Tiles up to 7 ft. height
Ceiling Oil Bound Distemper
Door Hardwood frames & Flush doors finished with paints
Windows/Glazing Hardwood/U PVC with required Fitting
Sanitary ware/ CP Fittings European Style WC and Wash basin (white colour)-with-ch-rame-plated brass fittings
Electrical Modular Switches

 

Price List


Basic Sale Price (BSP) Rs.6750/- Per Sq.ft. For 865 Sq.ft.
Rs.6250/- Per Sq.ft. For All Other Sizes
External Development Charges(EDC) & Infrastructure Development Charges (IDC) Rs.439/- per sq. ft.
Interest Free Maintenance Security (IFMS) Rs.50/- per sq. ft.
Club Membership Charges (CMC) Rs.1,00,000/- per unit
Fire Fighting Charges (FFC) Rs.50/- per sq. ft.
   
Car Parking Charges
Covered Rs.3,50,000/-
Mandatory No. of Car Parking Bay per unit
2BHK —TYPE I 01 (One) Covered
2BHK — TYPE II 01 (One) Covered
3 BHK — TYPE I 01 (One) Covered
3BHK —TYPE II 01 (One) Covered
3BHK + SERVANT 01 (One) Covered
   
Preferential Location Charges (PLC)
Podium — 2nd Floor Rs.175/- per sq. ft
3rd Floor — 9th Floor Rs.200/- per sq. ft
10th Floor —16th Floor Rs.150/- per sq. ft
17th Floor — 25th Floor Rs.100/- per sq. ft
26th Floor — 30th Floor Rs.50/- per sq. ft
Park Facing Rs.200/- per sq. ft
Pool Facing Rs.100/- per sq. ft
Corner Rs.50/- per sq. ft
60 Mtr. Road Rs.100/- per sq. ft
   
Power Back Up Charges (PBC)
2BHK & 3BHK Rs.90,000/- for 3 KVA
3BHK + SERVANT Rs.1,20,000/-/- for 4 KVA
Additional KVA — Rs.30,000/- per KVA
   

 

Payment Plan


Construction Linked Payment Plan (stilt + 34 &35 Towers)
At the time of allotment 20% of BSP less booking amount
On start of excavation at site 7.5% of BSP + 25% of EDC & IDC
On Completion of Basement Roof Slab 7.5% of BSP
On Completion of 3rd Floor Roof   Slab 5% of BSP+ 25% of EDC & IDC
On Completion of 7th Floor Roof Slab 5% of BSP
On Completion of 11th Floor Roof Slab 5% of BSP+ 25% of EDC & IDC
On Completion of 15th Floor Roof Slab 5% of BSP
On Completion of 19th Floor Roof Slab 5% of BSP+ 25% of EDC & IDC
On Completion of 23rd Floor Roof   Slab 5% of BSP
On Completion of 27th Floor Roof Slab 5% of BSP+ 50% of PLC
On Completion of 31st Floor Roof Slab 5% of BSP+ 50% of PLC
On Completion of top Floor Roof Slab 5% of BSP
On Completion of brick work 5% of BSP + 100% Car Parking
On Completion of plumbing & electrical work 5% of BSP
On Completion of flooring 5% of BSP
On the Offer of Possession 5% of BSP + 100% of (IFMS + FFC + PBC + Registration charges + Stamp Duty charges + Other charges)
Cheque in favour of “Pareena Infrastructures Pvt. Ltd.”

 

CLP (Stilt + 24 & 25 Floors)
   
At the time of Booking Booking Amount
At the time of allotment 20% of BSP less booking amount
On Start of excavation at site 7.5% of BSP + 25% of EDC/IDC
On completion of basement roof slab 7.5% of BSP
On completion of 3rd floor roof slab 7.5% of BSP + 25% of EDC/IDC
On completion of 7th floor roof slab 7.5% of BSP
On completion of 11th floor roof slab 7.5% of BSP + 25% of EDC/IDC
On completion of 15th floor roof slab 7.5% of BSP
On completion of 19th floor roof slab 7.5% of BSP + 25% of EDC/IDC
On completion of top floor roof slab 7.5% of BSP + 100% of PLC
On completion of brick work 5% of BSP + 100% of Car Parking
On completion of plumbing & electrical work 5% of BSP
On completion of flooring 5% of BSP
On offer of possession 5% of BSP + 100% of (IFMS + FFC + CMC
  PBC + Registration charges +
  Stamp Duty charges + Other charges)

 

DOWN PAYMENT PLAN (DPP)
Stages Percentage of BSP Percentage of Additional Charges
At the time of Booking Booking Amount  
On or before 60 days of Booking / On Allotment whichever is later 95% of BSP less Booking Amount 100% of (EDC & IDC + PLC + Car Parking Charges)
On offer of Possession 5% of BSP 100% of (CMC + IFMS + FFC + PBC + Other Charges + Stamp Duty & Registration Charges)
Down Payment Rebate 10% on (85% of BSP + 100% of PLC)  

 

Google Map


 

Layout Plan


 

Floor Plan